Abstract
After a brief overview of the design and construction of the Compact Muon Solenoid (CMS) experiment, the installation of its detector subsystems and the general commissioning strategy is reviewed. Particular emphasis is made on the performance measured with cosmic muons prior and after the collision data-taking and on the observation of the first beam events.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.