Abstract
The second LHC long shutdown period (LS2) was a crucial opportunity to complete the consolidation and upgrade projects for the CMS Resistive Plate Chambers (RPCs). The consolidation included detector maintenance for gas tightness, HV (high voltage), LV (low voltage) and slow control operation. Dedicated studies were performed to understand the behaviour of RPC currents with comparison to RUN 2. This paper summarises the activities performed and commissioning of CMS RPC on the surface (For RE4) and for full detector in CMS cavern in different operating conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.