Abstract

Construction planning methods have been in continuous evolution due to the increasing complexity of construction projects. Construction simulation modeling is one of the later stages of this evolution that has received much attention in research. Many simulation based construction planning methods developed modeling methods that attempt to cluster project activities into smaller sub-models that enhance model reusability. Many of these modeling methods, however, create new modeling elements that are not familiar to traditional construction simulation modelers. Therefore, the objective of this paper is to develop a method for clustering activities of large and repetitive construction projects for enhancing the reusability of those simulation models. The developed method does not create any new modeling elements and is called Clustered Simulation Modeling (CSM). CSM was evaluated in modeling an actual large-scale repetitive construction projects, and the results have illustrated the effectiveness of the method and the proposed clustering scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.