Abstract

AbstractPower plants lose efficiency when the air preheater elements are not replaced or cleaned as they deteriorate. Replacing is more expensive than cleaning but more secure to preserve power and lifetime. How many baskets should be then replaced and how many cleaned to achieve ‘satisficing’ goals of cost, power and lifetime? We design deterministic/stochastic goal programming approaches to this problem and develop a decision case for usual preheaters. Some discrepancies in results between both approaches appear, the deterministic model advising to replace less baskets than the stochastic, which is plausible due to the risk variable. Copyright © 2005 John Wiley & Sons, Ltd.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.