Abstract
This article presents a procedures plan developed from questions asked about cleaning and painting an average size (100,000‐gal) elevated storage tank exceeding AWWA standards and about coating the interior of the tank with a two‐coat, high‐build epoxy system (AWWA interior system No.1).
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.