Abstract

Access to clean water supply systems have not been fully available to all people, especially those living in rural areas. Ba’engas Village, located in Labang Sub-District, Bangkalan Regency, has not possessed clean water facilities to fulfil its people’s needs. The elevation difference and the distance of about 9 km between water resources causing difficulties in water provision. This research discusses clean water network planning in Ba’engas Village by utilizing the Pocong River, at a rate of 3,236 l/sec. The objective of this research is to investigate the provision of water availability for consumption up to the year 2035, simulate clean water networks and find out its results, and calculate planned budget. The modelling and simulation of clean water networks are developed utilizing WaterCAD V.8.i software. This research employs three alternatives, with different numbers of pumps and tanks each. The result of clean water projection is a rate of 4,936 l/sec. Based on the simulation results, alternative 1 was chosen, using 1 pump and 1 tank, according to the permitted planning criteria of speed between 0.1-2.5 m/sec, head loss gradient from 0 to 15 m/km, and pressure from 0.5 to 8 atm. The cost for clean water network planning with alternative 1 is estimated IDR 8,021,618,000.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.