Abstract

In order to solve the problem of heaping waste in aboveground, a cleanly mining technique of waste not discharged from coal mine was proposed. It includes two key points as follows: one is waste separation underground; the other is mining technique with preset packing body of waste without coal pillars. After the waste from the coal mining face had been separated out, the waste was used to preset packing body of waste. It is able to decrease stress of mine hoisting. The technique has been successfully used in Gaozhuang Coal Mine.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call