Abstract
This paper presents an overview of the existing literature on project control and earned value management (EVM), aiming at fulfilling three ambitions. First, the journal selection procedure allows to discern between high-quality journals and more popular business magazines. Second, the collected papers on project control and EVM, published in the selected journals, are classified based on a framework consisting of six distinct classes. Third, the classification framework indicates current trends and potential areas for future research, which can be summarized as follows: (i) increased attention to the stochastic nature of projects, (ii) enhanced validation of the proposed methodology using a large historical dataset or a simulation experiment, (iii) expansion of integrated control models, focusing on time and cost as well as other factors such as quality and sustainability, and (iv) development and validation of corrective action procedures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.