Abstract

This paper first describes the status quo of subway development in our country, analyzes the development trend of subway in our country, distinguishes the source of danger in civil engineering of subway from the perspective of unsafe behavior of people, the unsafe condition of material and environmental factors, And summarizes the existing methods of risk analysis. The safety checklist method and ALARP method are mainly selected to conduct risk analysis on the civil engineering works and the surrounding environment. At last, the risk control, management and monitoring measures of the subway construction are elaborated. The emergency plan for the civil engineering of the MTRC provides a safer guarantee for the construction of the MTRC.