Abstract

This article describes how cutting edge parametric-based engineering techniques have been used to achieve the detailed design of 2500 complex steelwork connections for the exoskeleton of the new City of Dreams hotel in Macau, China. It discusses the tools, methodology and strategy employed by the engineering team to automate the difficult and time-consuming process of creating, verifying and documenting the geometrically challenging, large-scale steel connections using finite element methods within an ambitious timescale of just 12 months.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.