Abstract

Formation sand control is always one of the main concerns of production engineers. There are some different methods to prevent sand production. Choosing a method for preventing formation sand production depends on different reservoir parameters and politic and economic conditions. Sometimes, economic and politic conditions are more effective to choose an optimum than reservoir parameters. Often, simultaneous investigation of politic and economic conditions with reservoir parameters has different results with what is expected. So, choosing the best sand control method is the result of thorough study. Global oil price, duration of sand control project and costs of necessary equipment for each method as economic and politic conditions and well productivity index as reservoir parameter are the main parameters studied in this paper.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call