Abstract

Arizona Public Service Company placed into service two 147 OOO-kvar 345-kV series capacitor banks in July, 1964, on their Phoenix-Four Corners transmission system. This paper is a general presentation of the background, engineering studies, and design, including the preparation of specifications, design of equipment components, and testing of these facilities. It is not within the scope of this paper to discuss in detail individual phases of the engineering studies involved. The intent is that more papers shall be written amplifying these specific studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.