Abstract

The possibility of increasing the efficiency of municipal wastewater treatment plant (WWTP) operation by changing the flow diagram of biological wastewater treatment in aeration tanks at minimum expenses for their reconstruction is shown in the paper on the example of one of the regional centres of Ukraine. The technology of nitri-denitrification of wastewater according to the flow diagram of the two-stage modified Ludzak-Ettinger process is offered for the considered conditions. The distribution of wastewater flows and internal nitrate recycling between the individual stages of this flow diagram has been optimized in order to minimize the residual content of total nitrogen in the treated effluents. Computer dynamic modelling of biochemical processes has proved the high efficiency and reliability of the flow diagram proposed by the authors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.