Abstract

This study explores the measures to achieve the global 1.5 °C temperature rise target (1.5 °C target) by analyzing the feasibility and obstacles of nuclear power in China. The 1.5 °C target imposes stricter requirements on China's nuclear power. Considering the available nuclear power plant sites, nuclear power layout, equipment manufacture & supply, nuclear power plant construction capacity, supportive operation & management talents, investment, cost effectiveness, and public acceptance, the achievement of the development objectives of nuclear power in China considering the 1.5 °C Target is difficult. However, it is possible if favorable decisions and policies are made.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.