The ecological environment promotes the construction of smart grids, while the smart substation is the key to the construction of smart grids. Based on the supervision of the Zigui 220 KV smart substation project in the Three Gorges Reservoir Region of China, this paper studies how to well create the supervision for the smart substation project construction. With the research focus of “four-control, two-management and one-coordination” in the supervision and according to the problems and experience in the project construction, some reasonable suggestions are put forward, and then the accumulated methods and experience by supervisors when they are engaged in the supervision for the smart substation project construction are summarized.

Highlights

  • Smart Substation, as an important foundation for the construction of strong smart grids, has developed vigorously in the past two years for the substantial supports from China’s government

  • How to play the role of power project supervision and how to carry out the work creatively so as to meet the requirements of smart grid construction, based on these problems, the author goes down to the project construction supervision personally, summarizes the experience of smart substation supervision based on typical cases, explores and concludes some new methods for new problems, and provides some practical significance for the supervision of smart substation project

  • It’s important to strengthen the comprehensive improvement of the environment and protect the ecological environment while pursuing the economic development, so as to achieve the win-win situation between environment and development, and the harmony between human and nature

Read more

Summary

Introduction

Smart Substation, as an important foundation for the construction of strong smart grids, has developed vigorously in the past two years for the substantial supports from China’s government. How to play the role of power project supervision and how to carry out the work creatively so as to meet the requirements of smart grid construction, based on these problems, the author goes down to the project construction supervision personally, summarizes the experience of smart substation supervision based on typical cases, explores and concludes some new methods for new problems, and provides some practical significance for the supervision of smart substation project

Special Requirements for the Three Gorges Reservoir Region in China
Smart Grids Are Brought into China’s “13th Five-Year Plan”
Implement the Supervision System and Guarantee the Project Quality
Determine the Critical Paths of the Project and Ensure the Project Progress
Collect Information in Time and Arrange Archives by Category
Conclusion