Abstract
Controllability and observability problems may manifest themselves during the application of a checking sequence in a test architecture where there are multiple remote testers. These problems often require the use of external coordination message exchanges among testers during testing. However, the use of coordination messages requires the existence of an external network that can increase the cost of testing and can be difficult to implement. In addition, the use of coordination messages introduces delays and this can cause problems where there are timing constraints. Thus, sometimes it is desired to construct a checking sequence from the specification of the system under test that will be free from controllability and observability problems without requiring the use of external coordination message exchanges. This paper gives conditions under which it is possible to produce such a checking sequence, using multiple distinguishing sequences, and an algorithm that achieves this.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.