Abstract

Workload characteristics are vital for both data center operation and job scheduling in co-located data centers, where online services and batch jobs are deployed on the same production cluster. In this article, a comprehensive analysis is conducted on Alibaba's cluster-trace-v2018 of a production cluster of 4034 machines. The findings and insights are the following: (1) The workload on the production cluster poses a daily cyclical fluctuation, in terms of CPU and disk I/O utilization, and the memory system has become the performance bottleneck of a co-located cluster. (2) Batch jobs including their tasks and derived instances can be approximated as Zipf distribution. However, for all batch jobs with directed acyclic graph dependency, they suffer from co-location with online services since the online services are highly prioritized. (3) The resource usages of containers have similar cyclical fluctuation consistent with the whole cluster, while their memory usages remain approximately constant. (4) The number of batch jobs co-located with online services is dependent on the mispredictions per kilo instructions of online services. In order to guarantee the QoS of online services, when the MPKI of online services rises, the number of batch jobs to be co-located on the same machine should decrease.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.