Abstract

This paper presents a case history of the leakage behavior during dewatering tests in the gravel strata of an excavation pit of a metro station in Hangzhou, China. The groundwater system at the test site is composed of a phreatic aquifer underlain by an aquitard and a confined aquifer with coarse sand and gravel. The sandy gravel stratum has very high hydraulic conductivity. The maximum depth of the excavation is 24 m below the ground surface, which reaches the middle of the aquitard strata, where the thickness of the clayey soil is insufficient to maintain the safety of the base of the excavation. To understand the hydrological characteristics of gravel strata, single- and double-well pumping tests were conducted, where a cut-off wall was installed 43 m deep with its base penetrating 2 to 3 m into the aquifer. Test results show that this partial cut-off of the aquifer cannot effectively protect the base of the excavation from the upward seepage force of the groundwater during excavation. Therefore, a new cut-off wall (second phase) was constructed to a depth of 54 m to cut off the confined aquifer. A second pumping test was conducted after the construction of the second phase cut-off wall, and test results show that this full cut-off combined with dewatering can control groundwater effectively during excavation. This finding indicates that when a deep excavation is conducted in a confined aquifer with high hydraulic conductivity, determination of the depth of the retaining wall should be based on three factors: the stability of the base, the upward seepage stability, and settlement control.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call