Abstract

The wellbore flow in a liquid-based underbalanced drilling process consists of a steady multiphase flow during normal drilling and a transient gas-liquid flow without mud-cycling. The theory of steady multiphase flow has been used to calculate the pressure profile of normal drilling. Therefore, it is vital to figure out how to calculate the transient pressure variation caused by formation fluid flow-ing into wellbore when the mud-cycling is stopped. In this paper, a numerical simulation method and a mathematic model are established to study the wellbore flow and to control pressure during the underbalanced drilling process with liquid-based mud. The results also shed a light on the hidden mechanism of this special flow.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.