Abstract

Completed in 2016, Chaoyang Bridge in China is the world’s first double-deck composite girder cable-stayed bridge with corrugated steel webs. It provides a dual four-lane highway above with cantilevered footways and cycleways below. As described in this paper, the bridge features several design innovations. These include the first use of corrugated steel webs for a cable-stayed double-deck crossing, new cable anchorage technology and a building information modelling management system to resolve structural defects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call