Abstract

We analyzed the impact of the heavy snowfall occurred from Feb. 10 to Feb. 14, 2011 on the inbound daily traffic volume of the Gangneung Highway Tollgate using time series regression models. We found that the maximum reduction rate of inbound highway traffic volume during the heavy snowfall period is 70%. The inbound traffic volume increased steadily to normal inbound traffic volume after 2 to 4 days from the date when the snowfall stopped. The reason why 2 to 4 days are needed to reach normal inbound traffic volume is that it took substantial time to clear snow from the roads.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call