Abstract

To mitigate the impact of wind forecasting error uncertainty, a Chance-Constrained Goal Programming (CCGP) based day-ahead scheduling model is proposed in this paper. Compared with the traditional Chance Constrained Programming (CCP) method, the CCGP based model is more flexible, which allows higher violation probability than the predefined probability in necessary situations. In this way, the day-ahead scheduling and the uncertain range covered by reserves can be both optimized. Therefore, the reliability and economy of the system with wind power uncertainty can be considered in details with more flexibilities. In addition, because slack variables in CCGP model have corresponding physical meanings, they can provide more information to system operators. Furthermore, numerical tests are performed with the IEEE 118 bus system with wind power input. Results indicate that the proposed method achieves a good balance of cost and risk. And the total operation cost, especially the unit commitment cost, is reduced by the proposed method. Comparative evaluations of the proposed CCGP method and CCP method are presented in the paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.