Abstract

We review the chance-constrained programming (CCP) model for event realization in activity networks (ANs), and the more recent contribution to it by Kress, from the points of view of validity and accuracy. We present a classification scheme of stochastic programming and confirm that the CCP does not solve the problem of finding a point estimate that satisfies a required confidence level, and is of little help in determining the cumulative distribution function (c.d.f.) of the project completion time. We show that the CCP leads to an extremely weak lower bound (l.b.) on the exact c.d.f. A backtracking approach is proposed that improves this l.b. via the CCP, which is still too weak to be of any practical value. Finally, we utilize the CCP approach to derive a result due to Kress in a simpler and more direct way. We also demonstrate that the result itself, unfortunately, is of questionable validity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.