Abstract

Rolling horizon procedures, where an infinite horizon problem is approximated by the solution to a sequence of finite horizon problems, are common in production planning practice and research. However, these procedures also lead to frequent changes in planned release and production quantities, a phenomenon referred to as nervousness. We examine the performance of two chance-constrained production planning models developed for systems with stochastic demand in a rolling horizon environment, and find that these formulations significantly reduce planned release changes (nervousness) while also improving cost and service-level performance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call