Abstract

The prefabricated construction method is the most practical and effective construction in the industry today in the world. It is widely considered a sustainable approach to the construction industry. However, in Ethiopia, particularly in Oromia it is not further growing where the construction method is a conventional method. The main aim of this research was to investigate the challenges of using prefabrication technology in Oromia Regional State. The results of this data show that the challenges of using prefabrication technology in Oromia Regional State mainly depends on factors such as Lack of suitable transportation, Lack of a synergetic information platform, Lack of practice and experience. Generally, the research concluded that lack of suitable transportation, lack of synergetic information platform, lack of practice and experience, and unintegrated industry chain were the major factor challenges of using prefabrication technology

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.