Abstract

Timely delivery of onshore oil and gas construction projects has been a significant challenge for many oil and gas construction companies operating in the oil-rich area of the Niger Delta. The region, characterized by wetlands and water bodies with creeks and river crossings, became the home of many International Oil Companies shortly after Oil was discovered in 1956. Because the region is hospitable and blessed with Petroleum resources, most operating companies need to pay more attention to the terrain in the area before engaging in full exploration. This paper examines the challenges and reasons for delays in onshore projects and makes recommendations that should be adopted to enhance the speedy delivery of projects. It is a case study of the Southern Swamp Associated Gas Solution Project of Shell Petroleum Development Company, Nigeria.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.