Abstract
Human activities have been limited by coronavirus disease 2019 (COVID-19), and the normal conditions of our lifestyles have changed, particularly in terms of electricity usage. The aim of this study was to investigate the impact of COVID-19 on the power sector in the Lao PDR in 2020, as well as the challenge of using solar energy to supply power to the network using an optimal approach. The returns on investment of network extension and the purchase of solar energy were also evaluated. Furthermore, load conditions caused by the country’s lockdown policy were analyzed. We analyzed the optimal sizing and location of solar energy using a particle swarm optimization method based on the main objective functions, with the system’s power loss decreasing and its reliability improved. The results demonstrated that the suddenly reduced load from industry and commercial business did not have a large impact on its operations; however, revenue was reduced. The optimal method for connecting solar energy to a network can reduce power loss and improve system reliability. In addition, we discovered that the location and capacity of solar generation can reduce the investment costs of extensions for new lines, with the surplus power being exported.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.