Abstract

This paper presents an upgrading and monitoring of a Swedish concrete railway bridge. The methods used for the upgrading as well as for the monitoring are innovative and new. Carbon fibre tubes are inserted in holes in the bridge deck, drilled in the transverse direction of the slab at a location ca. 40 mm from the top. Carbon fibre NSMR bars are bonded in transverse grooves in the soffit of the slab. Both methods are intended to increase the transverse bending moment capacity of the troughs' bottom slab in the ultimate limit state. Monitoring is performed to verify the effectiveness of the strengthening and to understand the behaviour of the bridge. However, for obvious reasons, monitoring is only carried out in the SLS (service limit state). Even though only marginal effects of strengthening could be recorded in the SLS, both the strengthening and monitoring were considered successful at a cost of approximately 8% of the total cost of a new bridge replacement.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.