Abstract
CERN is currently constructing an Extra Low ENergy Antiproton ring (ELENA), which will allow the further deceleration of antiprotons from the currently exploited Antiproton Decelerator (AD). In order to meet the challenges of ELENA the beam instrumentation systems of the CERN AD are being consolidated and upgraded. An updated controls architecture with a more flexible timing system needs to be adopted and obsolete systems must be replaced. This paper presents the status and plans for improved performance and measurement availability of the AD beam instrumentation with a decreased risk of failure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.