Abstract

A properly functioning cover over an uncontrolled landfill which is regulated under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) depends on both a well-engineered cover design and prudent construction practices. This paper focuses on several geosynthetic construction issues which ultimately impact the performance of the final constructed cover. Preparation and placement issues related to subgrade preparation, geosynthetic placement, cover soil placement and test sections are presented. Storage and seaming of the geosynthetics are discussed. Construction quality control and quality assurance programs are emphasized. In addition, relevant design issues pertaining to settlements, interface friction, and rigid-nonrigid connections are discussed. Although these issues apply to all landfills, this paper is based on experience gained from design, review and construction oversight of CERCLA landfill covers by the US Army Corps of Engineers.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call