Abstract
The facilities of the Grand Coulee Pumping Plant and the original starting procedures used for the 65 000-hp synchronous motor-driven pumps are briefly described, followed by a description and schematic diagrams of the controls now used in the automatic centralized power control scheme. The starting, stopping, and remote annunciation systems associated with the pumps are described in detail. A description of the control system for the 108 000-kW generator associated with the pump unit is also included. The system has proved very satisfactory, and after one season of operation with the centralized power control scheme, only two minor modifications were made to provide greater reliability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.