Abstract
Total Site Heat Integration (TSHI) is a technique of exchanging heat among multiple processes via a centralised utility system. An analysis of the integrated multiple processes, also known as the Total Site (TS) system sensitivity, is needed to characterise the effects of a plant maintenance shutdown, to determine the operational changes needed for the utility production and to plan mitigation actions. This paper presents an improved Total Site Sensitivity Table (TSST) to be used as a systematic tool for this purpose. The TSST can be used to consider various ‘what if’ scenarios. This tool can be used to determine the optimum size of a utility generation system, to design the backup generators and piping needed in the system and to assess the external utilities that might need to be bought and stored. The methodology is demonstrated by using an Illustrated Case Study consisting of three processes. During the TS normal operation, the Total Site Problem Table Algorithm (TS-PTA) shows that the system requires 1065kW of High Pressure Steam and 645.5kW of Medium Pressure Steam as the heating utility, while for the cooling utility, 553.5kW of Low Pressure Steam and 3085kW of cooling water are required. The results of the modified TSST proposed that a boiler and a cooling tower with the system design requiring a maximum capacity of 2.172MW of steam and 4.1865MW of cooling water are needed to ensure an operational flexibility between the three integrated processes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.