Abstract
Results of analysis and design efforts by McDonnell Douglas Astronautics Company (MDAC), Rocketdyne, Stearns-Roger, Inc., Sheldahl, Inc., and the University of Houston between 1 April 1976 and 30 June 1976 on ERDA Contract No. EY-76-C-03-1108 are summarized. This is the third quarterly technical progress report published on the Phase 1 Central Receiver Solar Thermal Power System contract. The dominant activities during the reporting period have involved the preparation of test facilities for the subsystem research experiments and the fabrication of the test hardware. Summaries of these activities are presented. Alternative design approaches for the 10-MWe pilot plant system and the current pilot plant project schedule are also presented and described.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.