Abstract

Based on interval arrangement characteristics of the mined branch roadways and pillars in continuous miner filling mining gob,the cemented filling mining thought which divided mining and filling both into two stages was put forward.The first stage was mining branch roadways and then filling gob with cemented materials in time, and the second stage was mining pillars and filling gob with the first stage filling body support when it meet designed strength. Industrial field test showed that branch roadways were smoothly mined and filled, filling body strength meet demand and pillars were safety mined out.Continuous miner filling mining technology could reache high production efficiency based on advantages of mining and filling parallel operation and filling spaces constructing easily.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.