Abstract
A cell management problem in cellular manufacturing system considering parts with different routings processed on machines in multiple cells is studied. A nonlinear mathematical programming model of the problem is proposed by minimizing the flow time in a cellular manufacturing system. To solve the problem,a scatter search approach is developed. This scatter search approach improves diversification generator to generate a collection of diverse initial solutions,and develops the reference set update method,subset generation method,solution combination method and improvement method for the cell management problem. Compared with the benchmark optimization software CPLEX on a set of test problems,the simulation results show the effectiveness of the model and the approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.