Abstract

Variation order on the construction project can negatively affect project implementation costs are swelling. This occurs due to the factors that cause variation work order. Data collection technique used observation and interview methods and then be made a factor analysis of causes and effects of variation order to the cost of implementation. These results indicate that the biggest factors causing variation work order is a design change with a percentage of 60%, while the smallest is the causative factor prime cost rate with the percentage of 2% of the total number of jobs variation order. The impact on costs due to the variation of work orders amounted to 4.78% of the amount of the initial contract with the percentage of 34.85% work structures and architectural work for 65.15% of the total variation work order.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.