Abstract
This scoping review aims to enhance construction project management practices by identifying the key factors contributing to time and cost overruns. More than 300 articles were studied, out of which 73 were relevant to this review scope. Following the methodological recommendations proposed by the Joanna Briggs Institute (JBI) and the PRISMA checklist, this scoping review explores research trends regarding the geographical and temporal contexts, the nature of projects analyzed, the research approach, and the main causes of time and cost overruns. Moreover, current research gaps within the field have been identified. Findings suggest that the volume and breadth of research on causes of time and cost overruns have grown over the years. Regarding geographical contexts, Asia and Africa have consistently contributed to the literature, while a notable absence of research is observed in Europe, America, and Oceania. In addition, a tendency among articles to replicate research approaches and methods has been identified. Lastly, this study reveals that the project execution phase emerges as the primary stage where cost and time deviations occur, emphasizing the crucial role of project management practitioners. Hence, results attest to the critical role of prioritizing more effective project management practices to mitigate unexpected time and cost overruns in construction projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.