Abstract

AbstractRoad and highway construction projects are plagued by unanticipated conditions and changes, which cause claims and cost overruns due to diverse causes. This study identified a set of project factors that might affect the rate of claim occurrence in different projects and used data from Colorado Department of Transportation projects to test the potential causes of claims to assess which project management attributes are most likely to lead to claims. A total of 780 projects were selected from a data set of 1,060 projects completed in a time window from 1997 to 2012. These showed 213 claims within a subset of 62 claim-contained projects. Results showed that delays are the main cause of claims in the projects studied and are more important than the effects of added items and change orders. The study also showed that projects with fixed completion date schedules are more susceptible to claims than projects with more flexible schedules. Actions indicated are for transportation project planners to adopt...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.