Abstract

This study investigates the fundamental reasons of reduction for excavation performance on shield TBM in the Han River riverbed tunnel by means of analysis of field measurement data. For the study: (1) measurement data were analyzed by both the thrust and penetration rate data in a given section with rock types and direction types, (2) a number of disk cutter consumption and types of abrasion were analyzed, (3) an exhaust ratio of screw conveyor and design problem of screw conveyor were analyzed by earth mud which becomes the rock powder. As a result of this study, it was found that the lack of penetration depth caused by lower thrust, disk changes according to rapidly changing rock types, and installed angle of screw conveyor, play an important role in the excavation performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.