Abstract

This paper concerns an investigation into the causes of high costs of construction in Nigeria. A preliminary survey involving all the professionals in the construction industry identified delays and direct cost overruns of the project as the principal factors leading to the high cost of construction. A questionnaire was then designed incorporating factors causing delays and cost overruns. It was distributed to engineers, architects, quantify surveyors, contractors and others involved in construction. A method of analysis was formulated and carried out based on the profession of the respondents and on the role of the individual in the industry (i.e., client, consultant, and contractors) and on the nature of construction (civil works and building works). Results indicate that: (1) High costs can be minimized by minimizing lapses in the management of human and material resources; (2) despite some slight differences, the professionals generally agreed that shortage of materials, methods of financing and payme...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.