Abstract

For many years, the issue of delay in MARA management procurement constructionprojects has been phenomenal. Its impacts were so significant that it tends to deceleratethe implementation of MARA strategic planning. This paper presents a survey study onsignificant causes of delay in MARA management procurement construction projects.The questionnaire used consists of identified 18 causes of delay. The study was carriedout on the current 12 (38.7%) MARA construction management procurement projectsscattered in peninsular Malaysia. The respondents were personnel that work as PMC(executives, resident engineers, and clerk of works) for those projects and clients(MARA state directors, project officers, and engineers). Seventy sets of questionnairewere distributed to the respondents and 58 sets (82.86%) returned. The results analysisrevealed that the significant delay causes were cash flow and financial difficulties facedby contractors, contractors’ poor site management and ineffective planning andscheduling by contractors. Several steps are proposed in order to avoid delay forMARA future project. Key words: Construction delay, MARA construction projects, Majlis Amanah Rakyat

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.