Abstract

Xi’an ancient city wall is a national key cultural relics protection units and the most completely preserved ancient city wall building in China. In recent years, the increase of wall cracks has seriously affected the overall performance of the wall, which is in dire need of professional maintenance. Through monitoring the present situation of 21st horse wall cracks, the damage factors and failure mechanism is analyzed in detail. The reinforcement method of steel pipe cast-in-place pile and lime soil compaction pile is proposed based on the existing problems to prevent the expansion of the cracks and maximized preserve the original architecture cultural style, which has reference significance for the protection of ancient building.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.