Abstract
This paper focused on identifies causes of cost overrun and delay factors in infrastructure projects. Mainly, a structured review of literature has been conducted for the purpose of knowing extend of time delay and cost overruns experienced by infrastructure projects. To know this issue this paper explored current state of cost overruns and delay in infrastructural projects. Principally, the reviewed of 15 empirical literatures demonstrated different causes of delay and cost overrun. Main findings proposed distinctive factors of cost overrun and delays, and the main of them; pitfalls and errors in design, economic and political instability, bureaucracy of owner, poor experience of contractors, late in payment to contractor for terminate work, incompetent contractor human resources, in accurate scheduling and initial cost estimation by contractor and recurrent design change.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have