Abstract
During the normal operation of the third-generation nuclear power plant, according to the requirements of the technical specification (TS), the CMT should be sampled every seven days, which should be controlled between 3400ppm and 4500ppm. However, due to various reasons, the boron concentration of CMT will drop abnormally. In order to meet the requirements of the technical specification, it is necessary to supplement boron to CMT frequently, which will cause a series of serious problems. Therefore, it is necessary and urgent to solve the problem of abnormal reduction of boron concentration in CMT.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.