Abstract
The object of this paper is to give briefly the procedure followed by the Illinois Central engineers in the layout, design, and erection of the catenary system. Brief reference also is made to the principal items of material entering into the construction and to methods of maintenance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transactions of the American Institute of Electrical Engineers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.