Abstract
This paper focuses on the procedure utilized in the construction of tilt-up irregular concrete panels that are constructed on-site using concrete slabs and wooden formwork. The case study required high-quality concrete finishing. The erection and installation procedure called for a maximum panel-to-panel joint tolerance of 1.27 cm (0.5 in.) , often 90° joints between panels. To meet precision requirements, the casting slabs were leveled and flattened with laser screed technology and smoothed with chemical solutions. To ensure that the final result met expectations, a mock-up model was built using different types of materials and to simulate site constraints. The architectural design is a composition of precast concrete panels like “Lego” pieces assembled similarly to a jigsaw puzzle. The unique construction process required a state-of-the-art analysis to produce the set quality. Quality conditions as set by the owner included creating a smooth concrete surface on all panels while avoiding damages and redu...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.