Abstract

ABSTRACTThe super-long and large-diameter steel pipe piles are often adopted for the construction of offshore oil platforms in deep sea. One constructability issue related to driving heavy pipe piles is the pile running. The term pile running refers to the quick penetration of a pile into the seabed as a result of its high self-weight and low resistance from the seabed. The unexpected pile running can cause the steel wire of the hammer to break or even the loss of the hammer. A case study of pile running at an oil platform is introduced in this paper. A simplified theoretical method is proposed to explain the mechanisms of the pile running in this case. A factor of friction degradation is proposed to calculate the dynamic skin friction from the static ultimate skin friction of surrounding soil. The comparisons between the predictions to the case history show that the proposed simplified method can be used to predict the pile running condition.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.