Abstract
Purpose – This paper aims to focus on the decision-making process of integrated system design. Buildings can benefit from different system integration working toward the unified goal of providing the needed conditions and improving the comfort level of occupants. It is important to engage all system needs and priorities in the design by keeping goal into consideration. Even though there is vast potential in the coordination of system design decisions, there is a need to increase the transparency of the decision-making process by developing methods to incorporate multi-dimensional design attributes. Design/methodology/approach – This is achieved by considering all system design priorities with respect to decision attributes, as well as the inter-system inputs based on information and knowledge. Data were collected through interviews, collaboration meetings and design document reviews, which helped to facilitate triangulation. Findings – This paper presents the findings of a case study of deep retrofit design process that seeks to reduce energy consumption through integrated system decisions with several system combinations. In addition, such design decisions highlighted the fact that the values need to be flexible at the system level. Research limitations/implications – This paper presents an in-depth analysis of a single case study. Multiple case studies are being investigated for the future of this research. Practical implications – This paper presents the methods used for integrated design process priorities that will enable design teams to make decisions that lead to improved energy performance in retrofit projects. Originality/value – The case study building in this paper is a showcase building with cutting edge technologies and techniques, as well as a scalable and collaborative design process. It is an example of a best-in-class retrofit process designed through whole building design principles within the target budget. The paper demonstrates system design selection criteria that are embraced by value prioritization.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.