Abstract

Building Information Modeling (BIM) is mainly being promoted and applied in civil and public building cost management, but it is seldom used in power construction industry. Electric power construction project involves many professionals and different types of buildings and structures. Coupled with Chinese specialized quantity calculation rules, these factors led to some obstacles encountered when it comes to the application of BIM. In this paper, a substation is used as the object of the study, Revit software is used to explore 5D modeling method and other problems related to cost. Especially, quantity statistics according to 2013 edition’s power quota rules is the most difficult, three solutions were provided and one particularly detailed. It can be concluded that as long as it achieves data transfer, BIM 5D technology can be used in the power construction industry and it will bring huge impact on power engineering cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.