Abstract

ABSTRACTThis article is a case study for an energy savings performance contract (ESPC) at the wastewater treatment plant for the City of Riverbank in California. The existing plant has an average of 1.67 million gallons per day (MGD) flow and consists of the headworks, four treatment ponds, and seven percolation ponds. Prior to the project, the treatment ponds used surface aerators to provide oxygen for the biologic process. The plant was primarily operated manually with limited dissolved oxygen control. The utility bills showed excessive energy use—annual usage was 5,673 kWh/MG/yr. Schneider Electric and the City of River-bank entered into a construction contract to retrofit the treatment ponds with blowers and fine-bubble diffusers for more efficient oxygen transfer. Additionally, a control system was installed to maintain a dissolved oxygen set point. This scope of work is estimated to save 75% of the electricity consumption at the wastewater treatment plant and will save the city 65% of their electric...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call